  • HKJC
    HKIA
    Metroplaza
    Millennium City
    Moko L3
    Moko L20
    New Town Plaza
    PolyU
    UST

HKJC Shatin Racecourse – Main Stable Precinct Refurbishment - Waterproofing on Roof.

HKJC Shatin Racecourse – Main Stable Precinct Refurbishment - Waterproofing on Roof

HKJC Shatin Racecourse – Main Stable Precinct Refurbishment - Waterproofing on Roof.

Hong Kong International Airport - Enchancement work for FSD Facilities

Hong Kong International Airport - Enchancement work for FSD Facilities. Significantly enhance the fire safety capability of Hong Kong International Airport, better ensuring the safety of the airport and passengers.

Metroplaze – Waterproofing and electrical works at L5 Funpark

Metroplaze – Waterproofing and electrical works at L5 Funpark. Waterproof engineering is crucial in construction as it can effectively prevent water from seeping into the building structure, protect the durability of the building, and keep the interior space dry.

Millennium City

The lobby of Millennium City adopts a full glass design, which can introduce more natural light and create an extraordinary atmosphere with a magnificent 12.4-meter-high lobby.

Moko – Renovation works for L3 Zone D (Foodcourt)

Moko – Renovation works for L3 Zone D (Foodcourt)

Moko – Replace curtain wall windows to louvers for L20, T1

Moko – Replace curtain wall windows to louvers for L20, T1

New Town Plaza I – Refurbishment & Repainting Works for Ceiling at L1 Common Area and taxi Station

New Town Plaza I – Refurbishment & Repainting Works for Ceiling at L1 Common Area and taxi Station.

PolyU – Repairing works for canopies at PolyU HHB & WK

PolyU – Repairing works for canopies at PolyU HHB & WK. The Hong Kong Polytechnic University (PolyU) is currently carrying out maintenance work on the sunshades of its HHB and WK campuses.

UST

We provide comprehensive waterproof and leak repair solutions, including roof leaks, brick free and wall free leak repair services

HKIA – Debounded wall rendering and painting of FS building

The exterior wall plastering and painting project of FS Building is currently underway at Hong Kong International Airport (HKIA). This project aims to repair and update the exterior walls of the building to improve its appearance and durability. By using high-quality plastering materials and modern painting techniques, the FS building will achieve a more beautiful and durable appearance.

Millennium City 2 - Anti-skid dressing for carpark entrance

Millennium City 2 is undergoing anti slip treatment at the entrance of the parking lot to improve the safety of vehicle travel. This project uses high-quality anti slip materials and applies anti slip coatings on the surface of the slope to increase the friction of the ground and prevent vehicles from slipping on damp or smooth surfaces. This treatment not only enhances the safety of parking lot usage, but also provides drivers with a smoother driving experience.

Millennium City 6 - Ceiling renovation at Lobby

Millennium City 6 is currently undergoing renovation work on the lobby ceiling to enhance its aesthetics and functionality. This renovation will adopt modern design and high-quality materials to ensure the durability and aesthetics of the ceiling, providing visitors and tenants with a more comfortable and elegant environment.

Millennity - Alteration works to Means of Escape Doors at L30 & L31, T1

Millennium is currently carrying out the renovation project of the escape doors in the T1 area of floors L30 and L31 to improve the safety and functionality of the building. This renovation will update and upgrade the escape doors to ensure they can be used quickly and safely in emergency situations.