玻璃、鋁質及門窗工程
P1760 — Replacement of the main frame and 2 sets of metal double-leaf doors on LG7/F near Lift 10-12, Zone C, HKUST
- 客戶
- HKUST
- 地點
- HKUST, Clear Water Bay
- 年份
- 2026
- 類別
- 玻璃、鋁質及門窗工程
Replacement of the main frame and 2 sets of metal double-leaf doors on LG7/F near Lift 10-12, Zone C, HKUST。
HKP 完成 Replacement of the main frame and 2 sets of metal double-leaf doors on LG7/F near Lift 10-12, Zone C, HKUST。本項目歸入「玻璃、鋁質及門窗工程」,工作重點包括現場度尺、拆換配合、框架 / 玻璃 / 門身接口工程、唧膠及完工調校,並按現場營運環境作實際施工協調。
