混凝土及外墙维修
P1716 — Rectification works for defective concrete spalling (17 sqm at 3 locations) on the concrete ceiling near main entrance of Lot 18A carpark
- 客户
- Po Fai
- 地点
- Hong Kong
- 年份
- 2025
- 类别
- 混凝土及外墙维修
Rectification works for defective concrete spalling (17 sqm at 3 locations) on the concrete ceiling near main entrance of Lot 18A carpark。
HKP 完成 Rectification works for defective concrete spalling (17 sqm at 3 locations) on the concrete ceiling near main entrance of Lot 18A carpark。本项目归入「混凝土及外墙维修」,工作重点包括缺陷检查、松散物料清除、混凝土 / 外墙修补、表面执修及安全配合,并按现场营运环境作实际施工协调。
