玻璃、铝质及门窗工程
P1760 — Replacement of the main frame and 2 sets of metal double-leaf doors on LG7/F near Lift 10-12, Zone C, HKUST
- 客户
- HKUST
- 地点
- HKUST, Clear Water Bay
- 年份
- 2026
- 类别
- 玻璃、铝质及门窗工程
Replacement of the main frame and 2 sets of metal double-leaf doors on LG7/F near Lift 10-12, Zone C, HKUST。
HKP 完成 Replacement of the main frame and 2 sets of metal double-leaf doors on LG7/F near Lift 10-12, Zone C, HKUST。本项目归入「玻璃、铝质及门窗工程」,工作重点包括现场度尺、拆换配合、框架 / 玻璃 / 门身接口工程、打胶及完工调校,并按现场营运环境作实际施工协调。
